SETUP. Thanks to our quick release system, a MASTERTENT Pavilion can be set up in less than 10 minutes.
Firmly anchored to the ground, it will withstand any onslaught. First the base frame is assembled, then the front panels and counter elements are inserted and finally the roof is stretched over top. The innovative tensioning system ensures stability and optimum stretching. Simply perfect.